Southwest Campus Apartments Construction (Warren Hall site)

Preliminary schedule of Construction Activity for 2019

Estimated datesActivityDescriptionNoise LevelDust Level
winter quarterfencing of perimeterpounding noise when setting fence postsmoderatelow
winter & spring quartersdemolitionnoise when breaking up concrete/asphalt and from vehicle back-up beepshighhigh
winter & spring quartersgradingnoise from vehicle back-up beeps
dust generated, but control measures in effect
moderatehigh
winter & spring quartersdirt haulingnoise from dump truck traffic as soil is hauled awaymoderatemoderate
winter & spring quarterssoil compactionnoise when pounding/vibrating the soil for compaction
noise from vehicle back-up beeps
dust generated, but control measures in effect
moderatemoderate
summer sessionsdigging for footingnoise from vehicle back-up beepslowlow
summer sessionspreparing formworknoise from hammering and cutting woodmoderatelow
summer sessionsplacing rebarnoise from banging metallowlow
summer sessionspouring concretenoise from concrete pump trucks and traffic during staging of concrete truckslowlow